Train is not running today
Train runs tomorrow at 10am
Train runs tomorrow at 10am
at BC WILDLIFE PARK
at BC WILDLIFE PARK

Volunteering is a great gig.

Grading
Grading machines hard at work getting the railroad bed ready to lay track.

Survey
Surveyor, deciding where the new tracks will be laid.

KSCRS Founders
Some of the KSCRS founding members sitting on the original 16" gauge train.

Maze Mural is underway
These murals are coming along great.

Driving Spikes
KSCRS member pounding spikes while building the track back in the late 70's.

Summer Students
Summer students installing culvert while laying the original track back in the late 70's.

Track work
First loop getting laid in the late 70's.